← Industrial Slip Testing / Sectors / Pharmaceutical Manufacturing
UKAS · PROCESS INDUSTRIES

Slip testing
for Pharmaceutical Manufacturing.

Pharmaceutical manufacturing is the most regulated industrial slip-testing brief in the UK — GMP cleanroom protocols, MHRA inspections, and the cumulative impact of validated-cleaning chemistry on resin floor coatings combine to make documented PTV management a core part of the Q…

17025 ISO/IEC accreditation
Pharmaceutical Man Sector covered

Pharmaceutical Manufacturing testing

Tier 1 · Process Industries

  • Sector contextPharmaceutical manufacturing is the most regulated industrial slip-testing brief in the UK — GMP cleanroom protocols, MHRA inspections, and …
  • Out-of-hours attendance23:00–05:00 visits to avoid production-shift disruption.
  • UKAS-accredited reportsAccepted by HSE, FSA, BRC, MHRA and PL insurers.
  • Multi-site programmesGroup annual contracts for portfolio operators.
Surfaces tested in pharmaceutical manufacturing

The pharmaceutical manufacturing surface vocabulary.

Every pharmaceutical manufacturing site has a distinct surface vocabulary that drives the testing protocol. We test the actual surfaces present, not a generic baseline.

  1. 01 · SURFACE

    Seamless polyurethane and epoxy resin cleanroom floorsthe dominant GMP-validated finish, with PTV strongly affected by validated cleaning chemistry

  2. 02 · SURFACE

    PVC sheet welded floors in lower-grade cleanroom zonestested independently

  3. 03 · SURFACE

    Anti-static and ESD-controlled flooring in solid-dose tablet-pressing hallsESD specification

  4. 04 · SURFACE

    Cementitious polyurethane in API handling zoneschemical-resistant

  5. 05 · SURFACE

    Stainless steel platform tread at vessel accesstested independently

  6. 06 · SURFACE

    Cleanroom airlock transition floorstested independently of parent zone

Specific risk zones

Where the incidents actually happen.

Generic slip testing misses the zones that actually generate incidents. Pharmaceutical Manufacturing sites have distinct high-risk zones that warrant independent testing.

Cleanroom airlock transitions

Operatives changing PPE in airlocks track residual cleaning solution from the high-grade zone into the lower-grade zone — PTV at airlock thresholds drops measurably during shift cycles.

Validated-cleaning residue accumulation

Repeated validated cleaning with hypochlorite, hydrogen peroxide, or quaternary ammonium chemistry slowly degrades resin topcoats — PTV trends over a 12-month cycle can identify topcoat replacement timing.

API powder spillage zones

Active ingredient handling areas combine fine-particulate slip risk with strict containment requirements — PTV testing must comply with airborne-containment protocols.

Loading dock to GMP threshold

The route from goods-in to GMP storage carries external contamination — PTV at the warehouse-to-GMP threshold is a defined regulatory documentation point.

Regulatory framework

Pharmaceutical Manufacturing · regulatory context.

Pharmaceutical slip testing supports MHRA GMP compliance under the Orange Guide / EudraLex Volume 4. While GMP doesn't specify PTV directly, the requirement to demonstrate that floors do not present an operational hazard means documented UKAS ISO/IEC 17025 PTV evidence is increasingly expected at MHRA inspections. HSE INDG225 and Workplace Regulations 1992 Reg 12 apply alongside. Reports must integrate with the customer's QMS documentation framework.

MHRA GMP Orange Guide / EudraLex Vol 4
HSE INDG225 Slips and trips
WHSWR 1992 Reg 12 Floor condition
COSHH 2002 API handling
Sector case study

Pharmaceutical Manufacturing case study.

An MHRA-licensed solid-dose pharmaceutical manufacturer commissioned twice-yearly UKAS pendulum testing across Grade C and Grade D cleanroom zones, the API receiving area, and the goods-out warehouse. Testing is performed during scheduled cleanroom shutdowns and reports are formatted for direct attachment to the customer's QMS as controlled documents. The customer's MHRA inspector cited the documentation as best practice during a routine inspection.

Related sectors

Adjacent industrial categories.

Request a Quote

Tell us about your pharmaceutical manufacturing site.

Whether you operate a single industrial site, a multi-site portfolio, or an FM contractor brief covering multiple operators, we'll return a fully-costed, no-obligation quotation within one working day.

Out-of-hours attendance

Mon–Fri, 8am–6pm office hours.
23:00–05:00 attendance for production-floor sites by arrangement.